OVERVIEW

ENERGY EFFICIENCY

OTHER SUSTAINABILITY FEATURES & MEASURES

DRAWINGS

MORE CASE STUDIES

ABOUT THE 2030 CHALLENGE

 
   
 

Building Type:
Higher education facility

Owner:
Simon Fraser University

Location:
8888 University Drive, Burnaby, BC

Construction Cost:

Saywell Hall (Phase 1):
$34.5 million CAD
7,730 SM (83,205 SF)

Blusson Hall (Phase 2):
$46 million CAD
11,400 SM (120,000 SF)

Completion: July 2007

PROJECT TEAM

Architect:

Perkins+Will Canada
P. Busby, D. Dove,
S. Ockwell, H. Kao, B. Greig, Z Smith, J. Loewen

Structural Engineer:

Fast & Epp

Mechanical Engineer and Traffic:

Stantec Engineering

Electrical Engineer:

Acumen Engineering

Landscape Engineer:

Phillips Earevaag Smallenberg

Code:

LMDG Building Code Consultants Ltd.

Cost and Quantity Surveyor:

BTY Group

Building Envelop:

BC Building Sciences Partnership

Programming:

RPG Resource Planning Group

Arts and Social Sciences Complex – SFU

Perkins+Will Canada

DRAWINGS


Site Integration



Floor Plans & Section Drawings