OVERVIEW

ENERGY EFFICIENCY

OTHER SUSTAINABILITY FEATURES & MEASURES

DRAWINGS

MORE CASE STUDIES

ABOUT THE 2030 CHALLENGE

 
   
 

Building Type:
Educational Services

Owner:
École Polytechnique de Montréal

Location:
Montreal, Quebec

Budget: $90,000,000

Completion: Summer 2005

PROJECT TEAM

Architect:

Saia Barbarese architectes (now Saia Barbarese Topouzanov architectes)

Designer: Mario Saia

Assistant Designer:
Vladimir Topozanov

 
Desnoyers Mercure et associés

Project Manager:
André J.Mercure

 
Menkès Shooner Dagenais Architectes (now Menkès Shooner Dagenais LeTourneux Architectes)

Project Manager:
Anik Shooner
(responsible for LEED component and coordination of electromechanical systems integration, site supervision)

Mechanical Engineer:

Bouthillette Parizeau et associés inc.

Electrical Engineer:

Pageau Morel et associés inc.

Building Structure:

Pasquin St-Jean et associés experts-conseils

Construction Management:

Le Groupe Axor inc.

Landscaping Consultant:

Williams Asselin Ackaoui et associés

LEED Support:

Lyse M. Tremblay architecte

Vertical Transportation Consultant:

Exim

Kitchen Design Consultant:

Bernard et associés

AV Equipment and Multimedia Systems Consultant:

Go Multimedia (classrooms, training rooms, laboratory)

Pavillons Lassonde, École Polytechnique de Montréal

Saia Barbarese architectes
Desnoyers Mercure et associés
Menkès Shooner Dagenais Architectes

DRAWINGS


Site Integration



Floor Plans & Section Drawings